St George’s Tower, Leicester

It’s a good job our glazing maintenance team have a head for heights. Working on and towering St Georges Tower in Leicester Dortech Maintenance have been employed by Clegg Construction to reconfigure a significant number of glazed panels and opening lights. The building is situation near the centre of Leicester and stands some 19 stories in height.

Our engineers work comprised of; removing two windows from the top floor to the 10th floor, using a hoist provided at the side of the building. The openings created from the window removal have then been used to facilitate the installation of new student accommodation spaces and once the new student living spaces have been completed our team will then reinstate the previous glazing and vents.